How Long Does It Take to Install Septic System – Guide
One of the biggest questions homeowners have when planning a septic tank installation in Jefferson City, MO, is, “How long does it take to install septic systems?” The average septic system construction time ranges between six and eight weeks. However, this timeline can vary for each project.
Learn what the installation process involves, why some projects may take longer to complete, and what you can do to facilitate the construction. At Superior Sewer Solutions, we understand the complexities of septic system installation and are here to guide you through the entire process.
Septic System Installation Involves Several Time-Consuming Steps
Installing a septic system proves much more complex than other plumbing projects. Since septic systems drain all wastewater from your home, installers have to carefully connect drainage pipes from various fixtures and appliances, including sinks, toilets, dishwashers, and showers. Before any of this can occur, however, contractors go through a series of preliminary inspections and tests.
The installation process takes several weeks because of the following steps:
- Soil testing: Experts must test the soil’s texture and drainage capabilities to determine whether your property is suitable for a septic system.
- Site planning: Installation crews must devise a plan that weighs the specific challenges your property presents. They often must obtain permits before beginning construction and ensure the installation follows local codes.
- Excavation: It’s then time to dig up the soil to place the septic tank.
- Tank installation: Experts can finally prepare the septic tank and drain field after completing the previous steps.
- Final inspection: You can begin using your septic tank after one final check of the system.
How long does it take to install septic system equipment? Devoting up to eight weeks for this project may seem like a long time, but it makes sense when you consider all the necessary steps installers must take.
Three Factors That Influence the Overall Septic Installation Timeframe
Narrowing down a septic system timeline can be difficult. You may experience no issues or face unexpected delays that prolong the project. Check out some potential setbacks that can increase the time it takes to complete your system’s installation.
1. Soil Testing Results
It’s easy to get basic information regarding your project’s timeframe when you type “how long for septic system installation” into a search engine. The exact timing usually boils down to your soil testing. It takes about two weeks for results to come in, though some homeowners may have to wait even longer.
2. Site Accessibility and Preparation
The time it takes to install septic system equipment often depends on certain limitations your property presents. For example, if experts find an appropriate site for the drain field and tank but trees or other structures block access to it, they’ll have to adjust their plan.
Preparing the site often takes a few days for properties with seamless accessibility. However, if crews have to accommodate poor site conditions, this phase may take up to two weeks.
3. Weather Conditions During the Excavation Phase
The average time to install septic tanks takes into account fair weather during excavation. In reality, your septic tank setup may take longer to complete when inclement weather hits the region. Rain and storms make digging up the soil challenging and usually force crews to wait for fair weather before resuming.
How To Ensure an Efficient Septic Tank Setup
Ask an expert, “How long does it take to install septic system equipment?” and they’ll tell you that you should devote up to two months of time to this project. If you’re looking to speed up the process and avoid costly delays, your choice of contractor makes a huge difference in how smoothly and safely everything proceeds.
Installers with years of experience know the common challenges that delay these projects and do everything in their power to expedite the installation. Hire a licensed septic system contractor with ample industry experience for a seamless installation experience. They will handle everything from obtaining permits to adequately preparing the site for excavation and tank installation.
Superior Sewer Solutions Makes Septic Tank Installation Easy
After reading this guide, you will no longer have to wonder, “How long does it take to install septic systems?” Let Superior Sewer Solutions make the installation easy and stress-free. We know how to efficiently navigate each step and accommodate your needs by following a septic tank size guide.
Give us a call today at (573) 672-4839 to schedule a consultation and receive a quote.